Entities
Planning, implementing and building the BeltLine
Reaching out to our community to raise awareness and funds
Environmental Impact Study
BeltLine Basics | Transit, Trails and Transportation | Environmental Impact Study (EIS)
Environmental Impact Study (EIS)
 
Table of Contents
 

The Metropolitan Atlanta Rapid Transit Authority (MARTA) and Atlanta Beltline, Inc.(ABI) are conducting a Tier 1 Environmental Impact Study that will examine the impacts of building transit and trail facilities in the 22-mile Beltline Corridor. The study will address potential effects on air quality; noise and vibration; land and water resources; visual resources; energy, geology and soils; hazardous materials; land use and zoning; environmental justice; displacements and relocations; public services and utilities; historical and archaeological resources; parklands; and construction impacts. The study will also consider any secondary effects that may surface in the future as a result of building these facilities. The environmental impact statement results from a multi-tiered (Tier 1 and 2) analysis process, which is a key step in turning the Beltline dream into reality.

A Tier 1 Environmental Impact Statement will more precisely define the right-of-way required to build transit and trails in the Corridor. As a consequence, MARTA/ABI will be better positioned to preserve this right-of-way. The Study will be conducted in accordance with guidelines established in the National Environmental Policy Act (NEPA) and the Georgia Environmental Policy Act (GEPA), which should protect eligibility for federal participation in funding these projects in the future.

Citizen involvement is a critical component of this study as it has been in previous Beltline studies. Members of the study team will reach out to agencies and public officials, community and faith-based organizations, labor organizations, homeowner associations and individual stakeholders using a variety of tools and techniques. Members of the study team want to visit with your organization! Please contact us! The objective is to inform and receive ideas and comments that will enhance and facilitate the implementation of the Beltline Project. The study is scheduled to be complete by the summer of 2010.

 

 

Maps
 

Newsletters and Updates
 
Videos
 

Also view all Videos on the Official BeltLine YouTube Channel Playlist:
Environmental Options for the BeltLine 2009:  Transit    Trails

LATEST VIDEOS













 

 

 

 

 


 

 

Popular Video Highlights:

 






Also view all Videos on the Official BeltLine YouTube Channel Playlist:
Environmental Options for the BeltLine 2009:  Transit    Trails

Reports and Technical Documents
 
Boards and Presentations
 
 TitleModified DateSize 
December 2010 Meeting Presentation Boards12/31/201012.57 MBDownload
Presentation from December 2010 Public Meetings12/31/20102.62 MBDownload
Fall 09 Workshop Series Presentation 11 12 09_color 2/10/20105.99 MBDownload
Fall Workshop Boards_FINAL 2/10/201025.50 MBDownload
BeltLine EIS August 18th 2009 SAC-TAC Presentation8/18/20094.89 MBDownload
2009-0817 MARTA-BeltLine Workshop Summary Board v28/17/20095.91 MBDownload
2009-0817 MARTA-BeltLine Workshop Summary Board v28/17/20095.91 MBDownload
2009-0814 Aug18 SAC-TAC Meeting Table Maps_SE8/14/20095.94 MBDownload
2009-0814 Aug18 SAC-TAC Meeting Table Maps_NW18/14/20096.57 MBDownload
2009-0814 Aug18 SAC-TAC Meeting Table Maps_SW8/14/20095.64 MBDownload
2009-0814 Aug18 SAC-TAC Meeting Boards_Concept1-CSX8/14/20093.17 MBDownload
2009-0814 Aug18 SAC-TAC Meeting Boards_Concept28/14/20093.25 MBDownload
2009-0814 Aug18 SAC-TAC Meeting Boards_AltOptions8/14/20092.61 MBDownload
2009-0814 Aug18 SAC-TAC Meeting Boards_Concept18/14/20093.27 MBDownload
2009-0814 Aug18 SAC-TAC Meeting Table Maps_NE8/14/20096.80 MBDownload
2009-0814 Aug18 SAC-TAC Meeting Table Maps_NW28/14/20096.55 MBDownload
2009-0814 Aug18 SAC-TAC Meeting Boards_Concept2-NS8/14/20093.11 MBDownload
2009-0814 Aug18 SAC-TAC Meeting Boards_TrailsA&B8/14/20092.97 MBDownload
April May Public Workshop Executive Summary5/31/2009776.13 KBDownload
MARTA Beltline NE Zone 0905155/15/200913.05 MBDownload
2009-0506 May 14th EER Public Hearing Presentation_FINAL5/14/20099.36 MBDownload
EIS BeltLine Workshop Presentation April 09 Final4/9/20093.45 MBDownload
EIS April 2nd City-wide-SAC Presentation_Final4/2/20099.84 MBDownload
Citywide Conversation_02Apr09 Meeting Minutes4/2/2009156.79 KBDownload
MARTA Beltline SW Zone 0904014/1/20099.62 MBDownload
MARTA Beltline Full Zones 0904014/1/20099.04 MBDownload
MARTA Beltline NW Zone 0904014/1/200912.64 MBDownload
MARTA Beltline SE Zone 0903313/31/20095.34 MBDownload
EIS TAC-SAC Presentation 120808 FINAL12/8/20086.14 MBDownload
Your Input

 



See Also
Stay Involved

- Get on our Mailing List

-
Project Newsletters

- Visit MARTA Website

More BeltLine Basics
Back to Top
Copyright © Atlanta BeltLine 2012. All Rights Reserved. - Login Web Partner: Greenjar